Blogs

Barefoot Swing Bridge Annual Maintenance Work Gears Up January 11
Posted by Century 21 Thomas Blogger | Wednesday, January 6, 2016


On Monday, January 11, crews from Saffo Contractors, Inc. will begin to set up for the start of annual maintenance work on the swing bridge at Barefoot Resort & Golf. The maintenance work, which includes paint touch up, will get underway on January 13 and will last for about three weeks.
Traffic controls will be established at the bridge and motorists should expect to encounter one lane of traffic at times throughout the maintenance period.


Community News

Browse the Archive

×
Back to Top